From 2020 onwards, the company has been preparing design and working documentation for projects for the construction and reconstruction of oil and gas processing facilities. The design of facilities as part of the ethane-containing gas processing complex in the area of the Ust-Luga settlement and the Astrakhan gas processing plant is being carried out.
Numerous projects have been developed and implemented for re-equipment, modernization and renovation of existing ships, as well as projects for ship hauls and transportation of non-standard large-sized and heavy equipment on ships.
More than 40,000 units of marine machinery (capstans, windlasses, towing winches, rope storage reel, etc.) and steering engines were produced according to the documentation of AO “ECS”.
At present, AO “ECS” is a modern engineering center focused on the development of a complete set of design documentation (preliminary studies, technical projects, working design and plaza-technological documentation) for the creation of vessels of various types, purposes and classes, as well as the implementation of copyright supervision and provision of technical assistance to construction plants in the process of ship construction.