Projects for vessel movement to their destination are carried out:
• for sea vessels on inland waterways (IWW), if for a number of reasons, they cannot make an independent passage (inconsistency with the dimensions of the IWW, ships not completed in construction, etc. );
• for river vessels, if the route passes outside the navigation areas established for the vessel.
Examples from a large number of completed haulage projects include:
• project for movement a sea vessel of the Neftegaz type on IWW;
• project for movement blocks of a floating drilling rig on IWW;
• projects for sea crossings of river passenger ships “A. Chekhov” and “V. Arsentiev";
• project for movement a barge pr. 81100 with a nuclear power plant reactor on board along the Gothenburg-Novovoronezh route (with the development of a project for strengthening the barge).